STEM Lab at Huntingtower School – Testimonial

Harwyn was approached to deliver a Harwyn that would form the centerpiece of the schools environmental and STEM program as a space for students to advance their studies and inquiring minds. The building was fully prefabricated in the Melbourne factory and delivered and installed in a day.

Here is what the school’s Projects Manager had to say about working with Harwyn on this project:

“We wanted a quick solution to create a hub for our school’s environmental and STEM projects to run from. We turned to Harwyn for a solution and placed an order for a 6m x 10m Pod. This being two transportable 3 x 10m pods, manufactured off site, then joined on site. “

“We were amazed at how much input we could have to the final setup; including door and window orientation, colour pallet, floor coverings and data and power positioning. Jason from Harwyn was most accommodating and used his experience and design team to fine tune the plans. The communication during the process was fantastic. “

“The foundations took a day and half. The logistics were extremely well planned. The location access was tight, and the delivery and lifting needed to be and were precise. Fit off took approximately three days. It was then handed over for use. “

“At all stages Harwyn checked on our satisfaction; minor changes were done on the spot and at no extra cost. The result was brilliant. “

“We have now enhanced the area to house the programs we wanted to run. This included ramps and decks, water collection, solar and wind power all of which were accommodated within the Harwyn design. “

“We have had no defects to deal. Thanks Jason and your team.”